Concrete calculator

Estimate cubic yards and bag counts for slabs, footings, columns, and post holes—before the truck arrives or the bags hit your cart.

Example values shown — enter your project measurements.

See results ↓

Project shape

Measurements

Add 10% wasteRecommended for spills, grade variation, and over-excavation
Order amount
1.36
cubic yards
1.23 yd³ base volume + 10% waste
12340 lb bags
8260 lb bags
6280 lb bags

How the concrete calculation works

Rectangular slabs and footings

Convert every measurement to feet first. For round columns and post holes, the calculator uses π × radius² × height, then converts cubic feet to cubic yards.

Length × width × thickness ÷ 27

One cubic yard equals 27 cubic feet. Bag estimates use typical cured yields: 0.30 ft³ for 40 lb, 0.45 ft³ for 60 lb, and 0.60 ft³ for 80 lb. Always check the yield printed on your mix.

Ready-mix vs. bags

The cheapest option is not always the easiest one. Match the delivery method to the volume, access, crew, and speed of your pour.

Choose ready-mix for larger pours

Usually the practical choice around 1 cubic yard or more.

  • Best for slabs, long footings, and pours that must stay continuous.
  • Ask about minimum-load and short-load fees before ordering.
  • Confirm the truck can reach the placement area or plan for a pump.

Choose bags for small, staged work

Often simpler below about ½ cubic yard.

  • Good for one or two post holes, repairs, steps, and pads.
  • No delivery window, but mixing dozens of bags is hard labor.
  • Buy all bags from the same product lot when finish color matters.

Common slab sizes

Quick estimates for a 4-inch-thick slab. The order amount includes the calculator’s recommended 10% waste allowance.

Slab sizeBase volumeOrder with 10%80 lb bags
8 × 10 ft0.99 yd³1.09 yd³49
10 × 10 ft1.23 yd³1.36 yd³62
12 × 20 ft2.96 yd³3.26 yd³147
16 × 20 ft3.95 yd³4.35 yd³196
20 × 20 ft4.94 yd³5.43 yd³245

Bag counts are rounded up and assume 0.60 cubic feet of yield per 80 lb bag. A supplier may round a ready-mix order to its accepted increment.

How many bags per cubic yard?

A full cubic yard is a lot of hand mixing. These standard estimates use typical package yields; moisture, compaction, and product formulation can change the real yield.

90 bags

40 lb concrete mix

About 0.30 ft³ per bag.

60 bags

60 lb concrete mix

About 0.45 ft³ per bag.

45 bags

80 lb concrete mix

About 0.60 ft³ per bag.

Where to buy materials

Home Depot

Partner links coming soon

Lowe's

Partner links coming soon

Affiliate disclosure: LarkKit may earn a commission from qualifying purchases when partner links become available, at no extra cost to you.

Concrete calculator FAQ

How do I convert cubic feet to cubic yards?

Divide cubic feet by 27, because one cubic yard contains 27 cubic feet. A 10 × 10 ft slab at 4 inches thick is about 33.33 cubic feet, or 1.23 cubic yards before waste.

How many bags of concrete make a cubic yard?

Plan on about 90 forty-pound bags, 60 sixty-pound bags, or 45 eighty-pound bags per cubic yard. Those counts assume typical yields of 0.30, 0.45, and 0.60 cubic feet, so verify the package label before buying.

How much extra concrete should I order?

Ten percent is a useful default for most small projects because the ground is rarely perfectly level and some mix is lost during handling. For a precisely formed indoor pour, 5% may be enough; irregular excavation can justify 10–15%.

How thick should a concrete slab be?

Four inches is common for patios, walkways, and many residential floors. Driveways and areas carrying heavier loads may need 5–6 inches or an engineered design; local soil, reinforcement, and code requirements matter.

Can I pour concrete in winter?

Yes, but fresh concrete must be protected from freezing. If air temperatures are near or below 40°F, use a cold-weather mix plan, warm materials as needed, and insulating blankets; never pour onto frozen ground.

What should I do with extra concrete?

Use a prepared spare form for stepping stones, equipment pads, or small landscape blocks before the mix begins to set. Do not wash wet concrete or cement slurry into storm drains, soil, or waterways; let leftovers harden and follow local disposal rules.